ANALISIS PENERAPAN MODEL PERSEDIAAN DENGAN PENDEKATAN ECONOMIC ORDER QUANTITY (EOQ) PADA PT. MAKMUR SENTOSA

Puji Astuti, Yunita (2019) ANALISIS PENERAPAN MODEL PERSEDIAAN DENGAN PENDEKATAN ECONOMIC ORDER QUANTITY (EOQ) PADA PT. MAKMUR SENTOSA. Skripsi thesis, Sekolah Tinggi Ilmu Ekonomi Indonesia (STEI) Jakarta.

[img] Text (COVER + ABSTRAK)
COVER.pdf
Available under License Creative Commons Attribution Non-commercial.

Download (544kB)
[img] Text (BAB 1)
BAB 1.pdf
Available under License Creative Commons Attribution Non-commercial.

Download (460kB)
[img] Text (BAB 2)
BAB 2.pdf
Available under License Creative Commons Attribution Non-commercial.

Download (1MB)
[img] Text (BAB 3)
BAB 3.pdf
Available under License Creative Commons Attribution Non-commercial.

Download (604kB)
[img] Text (BAB 4)
BAB 4.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial.

Download (791kB)
[img] Text (BAB 5)
BAB 5.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial.

Download (456kB)

Abstract

Abstract The purpose of this study is to find out how companies apply the Economic Order Quantity (EOQ) model at PT. Makmur sentosa to streamline inventory costs that are considered too large. The object of this research is the supply of Molitec steel raw materials, Toyota Tsusho Corporation (TTC), and Toyota Tsusho Korea. Comparison of the methods used by companies with the Economic Order Quantity (EOQ) method results in quite large differences in costs And the result is before using the EOQ method for ordering Molitec raw materials for a year is 23 times which results in a total cost of Rp. 14,902,099, after the EOQ method was made 4 orders a year with a total cost of Rp.46,947,122. For ordering Toyota Tsusho Corporation (TTC) steel raw materials for a year is 21 times which results in a total cost of Rp. 86,655,932, after the EOQ method is made 2 orders a year with a total cost of Rp. 16,039,915 and the last is to order steel raw materials Toyota Tsusho Korea (TTK) made 19 orders with a total cost of Rp. 277,270,598, becoming 5 times in an order with a total cost of Rp. 123,421,911. So that the method of procurement of inventory that can minimize inventory costs at PT. Makmur Sentosa is by using the Economic Order Quantity (EOQ) method Keywords: Economic Order Quantity (EOQ), Total Inventory Cost (TIC)

Item Type: Thesis (Skripsi)
Contributors:
ContributionContributorsNIDNEmail
Thesis advisorMaliki, FarmansjahUNSPECIFIEDUNSPECIFIED
Subjects: Manajemen > Manajemen Operasional
Divisions: S1 Manajemen
Depositing User: Ridho Adi Nugroho
Date Deposited: 11 Jan 2022 09:03
Last Modified: 11 Jan 2022 09:03
URI: http://repository.stei.ac.id/id/eprint/6787

Actions (login required)

View Item View Item